FERRONDO PORTABLE ONES - the work-filled and high-absorbing Gabione
07.08.09
One of FERRONDO® developed construction makes the safe and stable transport possible of the heavy portable giving ions. They are manufactured in particularly a workshop in the three-chamber system, built for it. In the center of the innovative finishing technique a concrete or a chipped wood concrete core is located, into which a hanging device is concreted. First the stand is assembled as single or double basket from galvanized screen parts and the external chambers with natural stones is filled. Afterwards the core with normal concrete, lightweight concrete or chipped wood concrete is filled. The cavities between the natural stones within the adjacent nuclear range are filled out by the flow behavior of the chipped wood concrete. Thus one develops for Verkrallung \ " in the natural stone filling. The compact group does not show the concrete core from the outside.
After approximately the concrete is solidified 12 hours, which knows Gabione filled by the work by means of the supporting device is raised and removed. Complex formwork and shaking work are not needed with this system. The head and/or top sides of the concrete is full-laminar taken off, in order to ensure the register accuracy of the over and/or next to each other standing giving ions and to achieve an optimal sound absorption. One on the other built the baskets on the building site result in a closed system. The butt joints are provided with high-absorbing Schallschutzwänden with seals material. Thus additionally with higher buildings an optimal load distribution in the joints is ensured.
Around more to experience you can download yourselves the brochure FERRONDO® PORTABLE ONES.